Click on the link below for the updates:
2016 7-11 Riverside Drive Weekly Advisory
2016 7-6 Riverside Drive Weekly Advisory
2016 6-28 Riverside Drive Weekly Advisory
2016 6-21 Riverside Drive Weekly Advisory
2016 6-15 Riverside Drive Weekly Advisory
2016 6-7 Riverside Drive Weekly Advisory
2016 5-31 Riverside Drive Weekly Advisory
Subject: 5-24-2016 Riverside Drive Weekly Advisory
Brown County
City of DePere – Village of Allouez
Schedule: May 23rd to August 5th, 2016.
Length: 3.2 Miles
Cost: $1.6 million
Location: STH 57 from Randall Avenue to Grignon Street
Description of project: This project is the mill, underseal and overlay of STH 57 (Riverside Drive). The project also includes the repair of inlets, signing and pavement marking.
May 23 – May 27:
Traffic control drums and signs being placed to delineate the work zone. Sawing operations will begin on the sideroads and inlet repair locations. Inlets along the southbound outside lane will be repaired from Lazarre Ave to Grignon St.
May 31 – June 4:
Milling, undersealing and asphalt paving operations will begin for the southbound lanes of STH 57. Both SB STH 57 lanes are projected to be paved from Grignon St to Lazarre Ave. by the end of the day Saturday June 4th.
Traffic Impacts:
Southbound STH 57 outside lane is closed from Grignon St. to Lazarre Ave. until both southbound lanes of STH 57 are paved.
The week of May 31st during non peak hours (9 AM to 4 PM) northbound traffic between STH 172 and Grignon St. will be reduced to one lane and southbound traffic will be shifted over to the northbound side of STH 57 to complete work operations on both southbound lanes. Southbound traffic will be driving on the milled or chip sealed pavement for portions of this stage.
Hauling restrictions will be in place for STH 57 starting at 12:00 PM on Friday May 27th until 6:00 PM Tuesday May 31st for the Memorial Day holiday. No work on STH 57 will occur during this time period.
Note: A business meeting is scheduled for Tuesday May 31st at 2:00 PM at the Allouez Village Hall.
Project information is also updated weekly on the following website:
http://projects.511wi.gov/weeklyupdates-ne/
Ben Thompson, P.E.
JT Engineering, Inc.
1077 Centennial Centre Blvd., Hobart, WI 54155-8820
Office: 920.468.4771 | Cell: 920.680.7285 | Fax: 920.468.7135
www.jt-engineering.com
Subject: 5-18-2016 Riverside Drive Weekly Advisory
Brown County
City of De Pere – Village of Allouez
Schedule: May 23rd to August 5th, 2016
Length: 3.2 Miles
Cost: $1.6 million
Location: STH 57 from Randall Ave to Grignon St
Description of project: This project is the mill, underseal and overlay of STH 57 (Riverside Drive). The project also includes the repair of inlets, signing and pavement marking.
May 16 – May 20: Message boards being placed in advance of the construction zone. Construction surveying activities will also be occurring along the corridor.
May 23 – May 27: Traffic control drums and signs being placed to delineate the work zone. Sawing operations will begin on the sideroads and inlet repair locations. Inlets along the southbound outside lane will be repaired from Lazarre Ave to Grignon St.
Traffic Impacts: North and southbound STH 57 traffic will remain in existing lanes with no restrictions for the week of May 16th. Lane closures and restrictions are expected to begin the week of May 23rd.
Hauling restrictions will be in place for STH 57 starting at 12:00 PM on Friday May 27th for the Memorial Day holiday.
2016 5-16 Riverside Drive Resurfacing 1st Business Meeting Minutes
2016 4-28 WIS 57 – Riverside Drive – Resurface_Schedule Update
2015 10-9 WisDOT Notice Riverside Drive Road Maintenance Starting Monday, October 12, 2015
2015 10-7 Update to Six Year Highway Improvement Prog Letter (Allouez)
2015 September NE Region Re-Balance – WI Dept of Transportation Program
Riverside Drive 2021/2022 Construction Year
http://wisconsindot.gov/Pages/projects/by-region/ne/wis57/default.aspx
2015 June 17 Riverside Drive Public Meeting Information
2015 June 17 WIS57_ PIM-Presentation
2015 June 1 Workshop-4_Agenda
2015 May 20 Workshop-3_Agenda
2015 May 13 Agenda Stakeholder Meeting 6
2014 11-12 Meeting Minutes 5
2014 11-12 WIS57_Stakeholder_Presentation
2014 11-12 Agenda Stakeholder Meeting 5 – Final
2014 10-08 Meeting Handout
2014 10-08 _Meeting Possible Questions
2014 10-01 _Village Presentation
2014 10-8 Notice of WIS 57 Public Meeting
Village Board Meeting Minutes – September 16, 2014
2014 09-16 Presentation to Village Board 1
2014 09-16 Presentation to Village Board 2
2014 Speed Fact Sheet
2014 8-20 _Meeting_Minutes
2014 8-20 Stakeholder Meeting 4_sign-in-form
2014 8-20 Agenda Stakeholder Meeting
2014 8-20 Meeting Invitation
2014 7-23 Meeting Minutes
2014 7-23 Meeting Agenda
2038 Projected Conditions Maps
2014 Setting Appropriate Speed Limits
STH 57 – Riverside Drive Project Location Map
Riverside Drive Meeting Invite on 3-13-2014
Workshop-1_Agenda_031314
2013 Community Sensitive Solutions Guidance
WI – 57 Comunity Sensitive Solutions Workshop #1_Survey
Community Development Forms
Permit required prior to renting a mobile storage unit or construction dumpster.
A Certificate of Appropriateness is needed when there are plans for reconstructing, altering, or demolishing the exterior of a property locally designated by the Village as historic.
Visit our Building Inspector page page to learn which projects require a building permit application.
Community Development Contacts
Trevor Fuller, AICP
Director of Planning and Community Development
920-448-2800 x 134